People ask what a four person shop actually does all day, usually right before they ask whether we can make something. This is the honest answer: a mix of short production runs that pay the light bill, repair work that pays better than it should, and the occasional job that nobody else in the metro would touch. Photographs of finished parts all look the same, so instead here is what the work is, what it costs, and how long it takes.
Three kinds of job keep the doors open. They are very different from each other and they need different things from a customer.
Overflow production
Short runs of 20 to 400 pieces that a bigger shop took and then could not fit. About half our hours.
One-off repair
Somebody brings in a part that broke and cannot be bought. Roughly a third of the work and most of the interesting days.
Prototype and race work
Small quantities, fast, usually from a sketch and a phone call rather than a finished drawing.
Machines, and why we keep the old ones when everybody says we should not.
The CNC side
Two Haas VF-2 verticals and a Mori Seiki SL-25 turning center, programmed in Mastercam, running most of our production hours.
The manual side
Three Bridgeports, two engine lathes and a surface grinder. People tell me to sell them. They are wrong.
One at a time, always, whether or not it makes sense in a given year. Four since 2014.
How it works here
Four years, indentured through the local, 8,000 hours logged, and no shortcut on the manual machines.
We take applications year round and interview whenever the bench has room. Details and how to apply are on the shop site.
🔗Current apprentice openingbrzezinskiprecision.com↗